We find
the lines

that move
your price.

We read your tender documents.
Your estimator decides.

Lower your bid risk

Free pilot on one live tender.

BILL OF QUANTITIES · 2.14 · DEWATERINGPreview · example data

as required by site conditions.

Mon 09Wed 11
Tender inGap list to your estimator

“Who wins the tender? The one who made the biggest mistake.”

Head of tendering at one of the largest general contractors, speaking at one of the largest cost-estimating conferences, 2026

Gaps in tender documents found too late cost margin.

2.22

bids rejected on average per public works procurement in 2025, up from 1.94 in 2024

Public Procurement Office, report for 2025
31.5%

Design documentation errors affect 31.5% of projects in Europe; claimed costs reach 38.1% of budgets.

HKA CRUX Insight IX, October 2026, 2,410 projects

Your last day to ask comes before your bid deadline.

Questions to the contracting authority have a deadline: the deadline for clarification questions in your tender, set by procurement law and the tender terms.

Your tender terms give the question deadline as

Example dates: change them to yours

From your tender terms: last day to askTue 17 November 2026

the date in your tender terms: 10 days before your bid deadline, Fri 27 November 2026

Both dates go into the pilot form below, where you can change them.

One clause as written. The same clause as delivered.

A short list of gaps (up to 15), each with a priority and a quote from the document, and draft questions to the contracting authority, ready to send. Drag the divider across the example, or switch it with the buttons below.

Example: school extension · fictional data

Contract template · page 14

4.2 The Contractor shall price all external works shown on drawing A-102.

Drawing register · tender set
  • A-100Site plan
  • A-101Ground floor plan
  • A-103Sections
  • A-104Elevations

Contract template · page 14

4.2 The Contractor shall price all external works shown on drawing A-102.

Drawing register · tender set
  • A-100Site plan
  • A-101Ground floor planA-102 · not in the set
  • A-103Sections
  • A-104Elevations
Gap3 of 14PriorityHigh

Drawing A-102 is named in the contract but is not in the tender documents.

Quote · cl. 4.2, p. 14

“…price all external works shown on drawing A-102.”

Draft question

“Please publish drawing A-102, or confirm which external works the bid should price.”

As written on the left: clause 4.2 names drawing A-102, and the register does not list it. As delivered on the right: the gap, its priority, the quote and the draft question. Drag the divider to the left.

We take the document work off your bid team, so your team spends its time on the price and the decisions. Fewer gaps slip into your price unnoticed; your estimator steers every decision.

Your estimator verifies and decides; we do the reading.

We read and prepare

Example gap · fictional

Plaster: 1,240 m² in the bill, 1,410 m² in the specification “Machine gypsum plaster, 1,410 m²” · Spec., 4.2
  • aAsk the contracting authority
  • bPrice it as a risk
  • cWrite it down as a bid assumption

Your estimator: what is true for this gap?

Tick what holds. Each tick shows what to weigh; there is no verdict.

  • Answers to questions are public, so not every gap should be asked.

  • A gap you do not clarify ends up in your price as risk, or as a loss.

  • Price it as a risk, or write it down as a bid assumption.

The decision to ask, price or assume is yours; we prepare it.

Not sure →Try it on a live tender →

You hand over the link. The first gap list in 2 working days.

28.00 6.00 6.00 ? 6.00 7.00 6.00 Classroom Classroom Classroom Hall Corridor 123456 dim? 28.00 6.00 6.00 ? 6.00 7.00 123456
Example drawing, drawn for this page · dimensions in metres · one dimension missing, as we would mark it
  1. 1You send the linkto a live tender, or its bid deadline.
  2. 2We replyand agree the pilot with you.
  3. 3Your documents reach usThe 2 working days start here.
  4. 4We read themAn expert in the loop reviews every result.
  5. 5The first gap listin your format: a letter to the contracting authority, or Excel.
  6. 6Your estimator decidesand sends the questions.

We take over the document review and deliver the result in your format.

Run by DO OK. Your documents stay in the EU.

ISO

27001

27018

9001

14001

They are never used to train AI models, and we can work in your infrastructure.

DO OK · a European company

ABC123 4.804.80 4.803.60 Meeting room23.04 m² Office23.04 m² Archive17.28 m² ABC123 4.804.80 Meeting room Office Archive
Example drawing, drawn for this page · dimensions in metres

Before you send us a tender.

Plain answers to what bid teams ask first.

You don’t know our tender like we do.

Your estimator verifies and decides; we do the reading.

Is my tender confidential?

Your documents stay in the EU and are never used to train AI models; we can work in your infrastructure.

What does it cost to try?

A free pilot on one live tender.

Does a person check the result?

An expert in the loop reviews every result.

Which documents do you read?

We review your tender documents (terms of reference, functional and utility programme, bill of quantities, specifications, contract template, indexation clause) before the deadline for questions.

Which question deadline applies to me?

The deadline for clarification questions in your tender, set by procurement law and the tender terms. You find it in the tender terms.

What does my managing director get out of it?

A register of bid assumptions you can use later as evidence for claims.

What about subcontractor quotes?

In preparation: subcontractor quotes compared for scope, exclusions, price validity and solvency.

Start with a free pilot on one live tender.

Send the link to the tender, or its bid deadline. We reply, and you send the documents.

Status

We reply, then you send the documents. Type the link or the bid deadline above to see the earliest first gap list, as a guess.

How DO OK handles your details: privacy policy.

Rather talk first? Book a short call by e-mail.

No date yet →

Project risk reduction service by DO OK

DO OK, a European company · ISO 27001, 27018, 9001, 14001